Skip to content

Strategy 1 Complete the All Ages and Abilities Network.

Next Strategy:
Strategy 2

The actions within this strategy are divided into two categories:

Action we will DOActions we will SUPPORT

Action we will do are followed by “DO” and are colored in dark gray, and actions we will support are followed by “SUPPORT” and are colored in light gray.

Learn more about how we get there

The All Ages and Abilities Network will include three primary bikeway types:

  • Protected bike lanes: routes on relatively busy streets with some form of physical separation from motor vehicle traffic, such as bollards, concrete curbs, parked cars, and planters.
  • Trails: non-motorized paths for pedestrians and bicyclists, typically more separated from the street than protected bike lanes, and are typically located near rivers, lakes, parkways, and railroad corridors.
  • Neighborhood greenways: routes that enhance local, low volume streets and give priority to people walking, biking, and rolling. This will include removing or significantly limiting motor vehicles along sections of the street.

There is an additional type of bikeway highlighted on the All Ages and Abilities Network called connector bikeways which are standard bike lanes without physical separation from motor vehicles, that may or may not meet the definition of an All Ages and Abilities bikeway depending on the context of the street (including volume, width and speeds).

The All Ages and Abilities Network was developed by studying numerous factors that influence where people bike, including transit, high density areas, commercial activity, land use, connections to schools and High Injury Streets for people biking.


  • Multiple types of vehicles in bike lane

    Multiple types of vehicles in bike lane

Actions

Actions to complete the All Ages and Abilities Network.

Bicycling 1.1

Build all low-stress routes identified on the All Ages and Abilities Network by 2030, which will include a total of 141 miles of new or upgraded bikeways, including:

81 miles of protected bike lanes that provide a low-stress riding experience on high volume corridors.


51 miles of new neighborhood greenways that manage motor vehicle volume and speed, improve safety at major crossings, and reduce stopping at minor crossings. Start with the Northside Greenway and the Southside Greenway.


9 miles of new trails that provide connections along the Mississippi River or along rail lines that could be converted to trails.

Supported goals:

Safety Climate Equity Mobility

Related actions:

None

Difficulty:

High

Timeframe:

2020-2023 (Years 0-3)

Status:

On-going

Bicycling 1.2

Improve existing bollard protected bike lanes with more permanent separation, such as curb barriers and planters or other green infrastructure.

Supported goals:

Safety Mobility

Related actions:

 

Difficulty:

Medium

Timeframe:

2020-2023 (Years 0-3)

Status:

On-going

Bicycling 1.3

Consider building bikeways not included on the All Ages and Abilities Network to respond to development opportunities and changing transportation demands.

Supported goals:

Safety Mobility

Related actions:

 

Difficulty:

Low

Timeframe:

2020-2023 (Years 0-3)

Status:

On-going

Bicycling 1.4

Use design to build projects that prevent blocked lanes or conflicts with loading and parked vehicles.

Supported goals:

Safety Mobility

Related actions:

 

Difficulty:

Medium

Timeframe:

2020-2023 (Years 0-3)

Status:

On-going