Strategy 2 Build bikeway connections that overcome significant physical barriers during the buildout of the All Ages and Abilities Network.

Previous Strategy:
Strategy 1
Next Strategy:
Strategy 3

The actions within this strategy are divided into two categories:

Action we will DOActions we will SUPPORT

Action we will do are followed by “DO” and are colored in dark gray, and actions we will support are followed by “SUPPORT” and are colored in light gray.

Learn more about how we get there

Bikeways work best in a connected network; the existing network will be added to and improved over the coming decade. The network is funneled into more focused corridors as major natural and manmade barriers are crossed, including rivers, railroads and highways. This strategy focuses on capitalizing on opportunities to partner with the Minnesota Department of Transportation, Hennepin County, Minneapolis Park and Recreation Board and others to ensure any crossing of a major barrier includes a high-quality facility for people traveling on bike or other micromobility vehicle, as well as for pedestrians. These opportunities are most obvious when a project is active, but the actions detailed here include efforts to retrofit existing bridges with facilities for increased safety and comfort for people biking and using micromobility options.

Like Walking Strategy 6, this strategy focuses, in part, on reconnecting neighborhoods that have been destroyed by freeway construction during the latter half of the 20th century. Reconnecting across barriers will help address the historic injustices these neighborhoods experienced and continue to experience due to the regional infrastructure.

  • Barrier bicycle crossing

    Barrier bicycle crossing

  • Barrier bicycle crossing

    Barrier bicycle crossing

  • Barrier bicycle crossing

    Barrier bicycle crossing

  • Protected bikeway

    Protected bikeway

Actions

Actions to build bikeway connections that overcome significant physical barriers during the buildout of the All Ages and Abilities Network.

Bicycling 2.1

Build protected bike lanes on existing motorized bridges over the Mississippi River, railroad corridors, freeways and expressways.

Supported goals:

Safety Equity Mobility

Related actions:

Walking 6.1, Walking 6.2, Walking 6.3, Walking 6.4, Walking 6.5

Difficulty:

High

Timeframe:

2028-2030 (Years 8-10)

Status:

Successfully completed to date and on-going

Significant milestone(s):

Since 2020, projects have included protected bikeways on 1st Ave S over the Midtown Greenway, and 10th Ave SE bridge over the Mississippi River. Additional projects are planned.

Bicycling 2.2

Partner with the Minnesota Department of Transportation to build a new non-motorized bridge over I-94 between Lowry Avenue North and Dowling Avenue North, connecting North Minneapolis to the Mississippi River and helping to re-establish the community's connection to the waterfront that was severely limited by the construction of the interstate.

Supported goals:

Equity Mobility

Related actions:

Walking 6.1, Walking 6.2, Walking 6.3, Walking 6.4, Walking 6.5

Difficulty:

High

Timeframe:

2028-2030 (Years 8-10)

Status:

In Progress

Significant milestone(s):

Public Works continues to coordinate with the Minnesota Department of Transportation on the potential for a new bridge over I-94 between Lowry Avenue North and Dowling Avenue North. As part of the Blue Line Extension Light Rail project, a new bridge will be built over I-94 at 22nd Avenue North to help re-establish the community's connection to the east side of I-94 and the Mississippi River.

Bicycling 2.3

Consider planning and securing funds for new crossings of Regional Bicycle Barriers (as defined in the Metropolitan Council’s Transportation Policy Plan) as project development opportunities arise.

Supported goals:

Safety Equity Mobility

Related actions:

 

Difficulty:

Medium

Timeframe:

2020-2023 (Years 0-3)

Status:

Successfully completed to date and on-going

Significant milestone(s):

Public Works collaborates with regional partners to plan and secure funding for crossings of regional bicycle barriers through various projects and planning initiatives. As part of the Blue Line Extension Light Rail project, a new bridge will be built over I-94 at 21st Ave N. Potential bicycle crossings of the Mississippi River are in early feasibility and planning stages.

Bicycling 2.4

Coordinate with Minneapolis Park and Recreation Board’s Neighborhood and Regional Park Capital Investment Projects to improve bikeway connections between parkway trails and City-owned bikeways.

Supported goals:

Equity Mobility Active Partnerships

Related actions:

Walking 7.7

Difficulty:

Low

Timeframe:

2020-2023 (Years 0-3)

Status:

Successfully completed to date and on-going

Significant milestone(s):

Public Works has coordinated with partners to improve bikeway connections by supporting on studies, master plans, and capital projects. Some key completed projects and studies include the Queen Ave Bike Boulevard and the Great Northern Greenway Bridge Study. Many other projects and plans are in progress.

Bicycling 2.5

Coordinate with the Minneapolis Park and Recreation Board to evaluate converting one-way trail operations to two-way, particularly around Bde Maka Ska, Lake of the Isles and Lake Harriet, taking into consideration safety, additional impervious surface, tree impacts and stormwater management.

Supported goals:

Equity Mobility Active Partnerships

Related actions:

 

Difficulty:

High

Timeframe:

2020-2023 (Years 0-3)

Status:

Successfully completed to date and on-going

Significant milestone(s):

In 2023, MPRB completed their 20-year vision for Cedar Lake and Lake of the Isles, identifying a two-way off street bike trail as a long-term community priority. Minneapolis Public Works supported with development of this plan.

Bicycling 2.6

Work with agency partners to evaluate opportunities to build new river crossings for the Midtown Greenway and Great Northern Greenway.

Supported goals:

Equity Mobility Active Partnerships

Related actions:

Walking 6.1, Walking 6.2, Walking 6.3, Walking 6.4, Walking 6.5

Difficulty:

High

Timeframe:

2028-2030 (Years 8-10)

Status:

Successfully completed to date and on-going

Significant milestone(s):

Public Works is supporting the Metropolitan Council’s Midtown Greenway Trail Expansion Planning project to explore an extension of the Midtown Greenway across the Mississippi River. In 2023 and 2024, Public Works supported the Minneapolis Park and Recreation Board’s Feasibility Study and Concept Planning for a new non-vehicular bridge over the Mississippi River between 26th Avenue North and 18th Avenue Northeast.

See also actions: